10-24-2026     3 رجب 1440

CM inaugurates, lays foundation of projects worth Rs 25 C in Beerwah

October 24, 2026 | BK NEWS SERVICE

Beerwah, Oct 23: Chief Minister Omar Abdullah on Friday inaugurated and laid foundation stones for a series of infrastructure projects worth ₹25 crore in Beerwah, Budgam, aimed at strengthening connectivity, improving electricity supply, enhancing civic amenities and boosting the area’s tourism potential.

The Chief Minister inaugurated a two-span truss girder bridge over Nallah Sukhnag, with each span measuring 35 metres worth ₹8 crore. He also laid foundation stones for the beautification of Nallah Sukhnag, including the development of walkways and installation of lighting, and the beautification of Beerwah town at an estimated cost of around ₹6.33 crore.
Describing the bridge as a long-pending demand of the local population, the Chief Minister said its completion and opening to the public would improve connectivity and ease movement for residents. He added that the riverfront beautification project, featuring a walking track and decks, would enhance public spaces and make the area more attractive for visitors.
The Chief Minister also laid the foundation stone for a Transformer Repairing Workshop at Beerwah, approved at a cost of ₹4.85 crore under the UT Capex Budget 2026–27. The facility is envisaged as a dedicated centre for repairing and rebuilding damaged distribution transformers, helping reduce repair and replacement time and improve the reliability of electricity supply.
Once operational, the workshop is expected to reclaim around 1,000 damaged distribution transformers annually, reducing outages and providing relief to consumers, particularly during the winter months.
Another key project of construction of a 10 MVA Receiving Station at Sail, Beerwah, approved at a cost of ₹4.50 crore, is expected to ease the load on neighbouring receiving stations, address winter overloading, improve voltage levels across Sail and adjoining villages, and reduce unscheduled power cuts and technical losses.
Speaking about the power infrastructure initiatives, the CM said the new receiving station was expected to become operational within four to five months. He also emphasised the importance of establishing a local transformer repair facility to address the difficulties faced by residents during winter.
“God willing, we will complete the workshop as soon as possible,” he said.
He also laid the foundation stone for a Sub-Divisional Office building at Sonpah, Beerwah, approved at a cost of ₹82.29 lakh under the UT Capex Budget 2026–27. The proposed building will provide dedicated administrative space, streamline office functioning and improve access to public services. Work on the project has recently commenced.
The infrastructure initiatives are aimed at improving essential services, strengthening local infrastructure and creating better civic amenities for the people of Beerwah and adjoining areas.

CM inaugurates, lays foundation of projects worth Rs 25 C in Beerwah

October 24, 2026 | BK NEWS SERVICE

Beerwah, Oct 23: Chief Minister Omar Abdullah on Friday inaugurated and laid foundation stones for a series of infrastructure projects worth ₹25 crore in Beerwah, Budgam, aimed at strengthening connectivity, improving electricity supply, enhancing civic amenities and boosting the area’s tourism potential.

The Chief Minister inaugurated a two-span truss girder bridge over Nallah Sukhnag, with each span measuring 35 metres worth ₹8 crore. He also laid foundation stones for the beautification of Nallah Sukhnag, including the development of walkways and installation of lighting, and the beautification of Beerwah town at an estimated cost of around ₹6.33 crore.
Describing the bridge as a long-pending demand of the local population, the Chief Minister said its completion and opening to the public would improve connectivity and ease movement for residents. He added that the riverfront beautification project, featuring a walking track and decks, would enhance public spaces and make the area more attractive for visitors.
The Chief Minister also laid the foundation stone for a Transformer Repairing Workshop at Beerwah, approved at a cost of ₹4.85 crore under the UT Capex Budget 2026–27. The facility is envisaged as a dedicated centre for repairing and rebuilding damaged distribution transformers, helping reduce repair and replacement time and improve the reliability of electricity supply.
Once operational, the workshop is expected to reclaim around 1,000 damaged distribution transformers annually, reducing outages and providing relief to consumers, particularly during the winter months.
Another key project of construction of a 10 MVA Receiving Station at Sail, Beerwah, approved at a cost of ₹4.50 crore, is expected to ease the load on neighbouring receiving stations, address winter overloading, improve voltage levels across Sail and adjoining villages, and reduce unscheduled power cuts and technical losses.
Speaking about the power infrastructure initiatives, the CM said the new receiving station was expected to become operational within four to five months. He also emphasised the importance of establishing a local transformer repair facility to address the difficulties faced by residents during winter.
“God willing, we will complete the workshop as soon as possible,” he said.
He also laid the foundation stone for a Sub-Divisional Office building at Sonpah, Beerwah, approved at a cost of ₹82.29 lakh under the UT Capex Budget 2026–27. The proposed building will provide dedicated administrative space, streamline office functioning and improve access to public services. Work on the project has recently commenced.
The infrastructure initiatives are aimed at improving essential services, strengthening local infrastructure and creating better civic amenities for the people of Beerwah and adjoining areas.


  • Address: R.C 2 Quarters Press Enclave Near Pratap Park, Srinagar 190001.
  • Phone: 0194-2451076 , +91-941-940-0056 , +91-962-292-4716
  • Email: brighterkmr@gmail.com
Owner, Printer, Publisher, Editor: Farooq Ahmad Wani
Legal Advisor: M.J. Hubi
Printed at: Sangermal offset Printing Press Rangreth ( Budgam)
Published from: Gulshanabad Chraresharief Budgam
RNI No.: JKENG/2010/33802
Office No’s: 0194-2451076
Mobile No’s 9419400056, 9622924716 ,7006086442
Postal Regd No: SK/135/2010-2019
POST BOX NO: 1001
Administrative Office: R.C 2 Quarters Press Enclave Near Pratap Park ( Srinagar -190001)

© Copyright 2023 brighterkashmir.com All Rights Reserved. Quantum Technologies

Owner, Printer, Publisher, Editor: Farooq Ahmad Wani
Legal Advisor: M.J. Hubi
Printed at: Abid Enterprizes, Zainkote Srinagar
Published from: Gulshanabad Chraresharief Budgam
RNI No.: JKENG/2010/33802
Office No’s: 0194-2451076, 9622924716 , 9419400056
Postal Regd No: SK/135/2010-2019
Administrative Office: Abi Guzer Srinagar

© Copyright 2018 brighterkashmir.com All Rights Reserved.